Kolin Soma 510MW Thermal Power Plant Project

Project Name : Kolin Soma 510MW Thermal Power Plant Project

Client: KOLİN/HİDRO-GEN A.Ş.

Location: SOMA/MANİSA

Scope: Currently BİRMEK has signed 3 separate contracts for this project.

  • Boiler II- Steel Structure Erection
  • Turbine Building II- Steel Structure Erection
  • Coal Handling System Erection

Start Dates:

  • Boiler II- Steel Structure Erection : 05.05.2016
  • Turbine Building II- Steel Structure Erection: 01.09.2016
  • Coal Handling System Erection : 01.03.2017