Proje: ZERGER 432 MW BASİT ÇEVRİM ENERJİ SANTRALİ
Müşteri: Türkmenistan Enerji Bakanlığı
Yüklenici: Rönesans Endüstri Tesisleri İnşaat ve Ticaret A.Ş.
Birmek İş Kapsamı:
- 3×144 MW MHI Turbines, Generator Mechanical, Structural Steel Erection
- 3.220 Tons Structural Steel and Equipment Erection
- 6.320 WDI Piping Erection, Insulation and Painting
- Instrumentation Works
- Flushing and Pre-Commissioning
Proje Yeri: Lebap / Turkmenistan
Başlama Tarihi: 1.06.2020